LannyPC
TUG Member
Question About Cut-off Dates
When placing a want ad in the LMR forum, can one have a range of start dates (provided they are within the 45-day limit) or does it have to be one specific date?
For example, today is October 15 and the LMR cut-off date is November 29. Can I post a want ad stating that I would like a check-in date anywhere between November 20-29 or must I say that I would like a November 23 check-in date?
When placing a want ad in the LMR forum, can one have a range of start dates (provided they are within the 45-day limit) or does it have to be one specific date?
For example, today is October 15 and the LMR cut-off date is November 29. Can I post a want ad stating that I would like a check-in date anywhere between November 20-29 or must I say that I would like a November 23 check-in date?